9 776 257
meters drilled with Omac drilling fluids

7 042 days
accidents free

During 2021, Omac Integrated drilled over 1.6 million meters in more than 930 vertical, directional and horizontal wells (up to 4,000 meters deep), including 2 horizontal wells using OBM at the Bashneft-Dobycha project.

Results of 2021