9 349 567
meters drilled with Omac drilling fluids

6 827 days
accidents free

1000 wells drilled

Drilling of the 1000th wells using technologies and services of Omac Integrated is completed.

During this time more than 2 000 000 meters were drilled at more than 130 fields of Kazakhstan near and far abroad.

7 November 2014