10 422 612
meters drilled with Omac drilling fluids

7 288 days
accidents free

KDR-2023 – Well Engineering

“Omac Integrated” LLP has taken part in the 8th round table KDR in Aktau, which includes the whole cycle of well engineering.

21 September 2023