9 776 257
meters drilled with Omac drilling fluids

7 053 days
accidents free


Kazakh Drilling Roundtable 2015

“Omac Integrаted” LLP took part as the Silver sponsor on the 1st Kazakh Drilling Roundtable, which took place in Astana on September 17, 2015.

18 september 2015