10 422 612
meters drilled with Omac drilling fluids

7 284 days
accidents free

RDCR-2019 – Well Engineering

“Omac Integrated” LLP has taken part in the 7th round table RDCR in Moscow, which includes the whole cycle of well engineering.

11 April 2019