9 776 257
meters drilled with Omac drilling fluids

7 043 days
accidents free

Kazakh Drilling Roundtable 2016

«Omac Integrated» LLP took part in the second oil and gas forum in the area of drilling and construction of wells – Kazakh Drilling Roundtable.

KDR is an excellent platform for sharing knowledge and experience, as well as developing the better understanding of the technological challenges faced by the drilling sector.

1 September 2016