С растворами Омас пробурено:
7 185 216 метров

6 342 дней
без инцидентов на производстве

The results of year of collaboration with JSC «Rosneft» are summed up

During this period more than 50 wells were drilled on fields of JSC «Rosneft» where the efficiency of the used technologies and products, including the introduced HydPro and SurgeMod software products was confirmed.

1 August 2015