2024 Year in Review
The year 2024 was a year of steady growth and the execution of technologically challenging projects for Omac Integrated LLP. During the year, the company drilled over 1.3 million meters across more than 600 vertical, deviated, and horizontal wells.
In 2024, the company’s specialists successfully developed and implemented an innovative high-temperature water-based drilling fluid system, tailored for ultra-deep drilling conditions and aggressive formation environments. This system ensures stability of parameters at temperatures above 180 °C, effective filtration control, and reliable equipment protection.
Particularly noteworthy are two strategic projects — the drilling of exploration wells PZ-1 (Turgay Paleozoic structure) and SG-8 (Karaton Podsolevoy block) with a design depth exceeding 5,500 meters. These projects are characterized by high formation pressures, elevated temperatures, and the presence of hydrogen sulfide, requiring the use of advanced engineering solutions.
January 1, 2025